The Equipment is in, check and compare the Before (orange tails) and After. Before Before Before Before After After After After After New Equipment A/C Unit
Project Updates Fire and sprinkler system being installed. Flooring in in stock and scheduled to be installed on 11/21. Drywall ceiling for back of the